Surrey, BC, May 2, 2018--Powertech announced that it has conducted assessments at nine facilities in the Township of Langley, British Columbia, to determine the suitability for public Level 2 (L2) electric vehicle (EV) charging infrastructure.
Surrey, BC, November 22, 2016--Powertech Labs and an international electric research organization have announced plans to jointly develop a unique new method for hybrid simulations of large power systems.
Surrey, BC, November 18, 2016--Downtown Vancouver, Canada's densest urban area, is experiencing rapid growth. To help the area keep pace with future energy needs, BC Hydro announced that it has launched the Downtown Open Loop Project.
Vancouver, BC, July 22, 2016--Powertech's technology for online extraction of polychlorinated biphenyls (PCBs) from transformer oil was successfully installed and operated at BC Hydro's Cloverdale Substation in Surrey.